Reference Number |
7414941 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
Construction of Guinbunyugan Pathway of PENRO, Iloilo FMP |
Area of Delivery |
Iloilo |
Solicitation Number: |
2021-04 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
National Competitive Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 8,108,884.47
|
Delivery Period: |
150 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Awarded |
Associated Components |
6 |
Bid Supplements |
1 |
Document Request List |
8 |
Date Published |
18/01/2021 |
Last Updated / Time |
01/04/2022 14:09 PM |
Closing Date / Time |
08/02/2021 09:30 AM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region VI BILL OF QUANTITIES Subproject Title/Name Construction of Guinbonyugan Pathway Category Sub-Project Number Physical Test 1.079 km Brgy./Mun./Province Jalaur Subwatershed, Municipality of Calinog, Iloilo, Region 6 Total Estimated Subproject Cost (PHP) 8,108,884.47 Project Description: Implementation Mode by contract "Construction of Guinbonyugan Pathway with a total length of 1.079 Km. The maximum grade of the Pathway ranges from 30% to 39% higher than the grade criteria. The carriageway of all section is paved with 1.5 meter wide of Portland Cement Concrete Pavement (PCCP) whose thickness is 0.15 meter and 0.1 meter thick of subbase course, In critical curve, the PCCP pavement it widened to 2.0 to serve as a Parkway. Side drainage and cross structures were also provided. The subproject is located in the Jalaur Subwatershed, Municipality of Calinog, Iloilo. " Project Duration 150 Calendar Days (w/ 30 unworkable days) Equipment Needed Backhoe,0.98 cu.m., 138 hp Tractor Cargo Truck, 6 tons, 195 hp Dump Truck 4 to 6 cu. Yard w/ winch Walk Behind Roller, Vibratory,0ne tonner Plate Compactor, Vibratory, 5 hp Concrete Vibrator, 50mm dia., Gas Driven Concrete Screeder Portable Asphalt kettle Bar Cutter, 20mm dia. Concrete Saw, 12", 5 lpm, Gas One Bagger Mixer Welding Machine Water Truck/Pump, 16000 lit ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST PART A OTHER GENERAL REQUIREMENTS A.1.1 (1) Construction of Combined Field Office,Laboratory and Living Quarters Building for the Engineer,40 sq.m. Including furniture,chairs and building maintenance. 40 sq.m TOTAL OF PART A PART B OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monuments and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S. B.9 Mobilization / Demobilization 1 L.S. TOTAL OF PART B PART C EARTHWORK 100 (1) Clearing and Grubbing w/ Stripping 0.64 ha. 102 (2)a Roadway Excavation (Surplus Common), including Disposal 1,584 cu.m. 102 (3)a Roadway Excavation (Surplus Soft Rock) 475 cu.m. 103 (1)a Structure Excavation (Manual) 207 cu.m. 103 (6) Pipe Culvert and Drainage Excavation 9 cu.m. 104 (1)b Embankment from Roadway Excavation 890 cu.m. 105 (2) Subgrade Preparation (Existing Pavement) 1,618 sq.m. TOTAL OF PART C PART D SUBBASE AND BASE COURSE 200 Aggregate Subbase Course, 0.10 m. thk. 162 cu.m. TOTAL OF PART D PART E SURFACE COURSES 311 (1)a.1.1 PCCP, 0.15m. thk.,3000 psi. 1,618 sq.m. TOTAL OF PART E Part G DRAINAGE AND SLOPE PROTECTION 404 Reinforcing Steel, Grade 40 506 kg. 405 (1)a Structural Concrete, 3000 psi,28 days, including Formworks 94 cu.m. 500 (1)c Pipe Culvert,910 mm dia.,including Sand Bedding and concrete collar 6 lm. 507 (1) Rubble Masonry w/ 4" dia. PVC weepholes (staggered) including filters 204 cu.m. 510 (1) Bed Course Granular Material (Gravel Bedding) 1 cu.m. 515 (3) Structural Backfill (Common Soil) 12 cu.m. TOTAL OF PART G Part H MISCELLANEOUS STRUCTURES 613(1)a Preformed Construction Expansion For Expansion Joint 3 sq.m 613(1)b Concrete Joint Sealant (Hot Poured Elastic) for Control Joints 135 kg. TOTAL OF PART H TOTAL ESTIMATED SUBPROJECT COST submitted by: Name of Represntative of Bidder Position Name of Bidder
Pre-Bid Conference January 27, 2021 at 9:30AM Submission & Opening of Bids - February 8, 2021 at 9:30AM Cost of Bid Docs - P8,500.00 |
|
Line Items |
1 | Construction of Guinbunyugan Pathway | Pathway | 1 | Lot | 8,108,884.47 |
|
Pre-bid Conference |
27/01/2021 |
9:30:00 AM |
DENR, PENRO, iloilo Old Rotary Park, Brgy. Concepcion, iloilo City |
|
|
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
17/01/2021 |
|
|
|
|
|