Reference Number 7414941
Procuring Entity DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO
Title Construction of Guinbunyugan Pathway of PENRO, Iloilo FMP
Area of Delivery Iloilo

Solicitation Number: 2021-04
Trade Agreement: Implementing Rules and Regulations
Procurement Mode: National Competitive Bidding
Classification: Civil Works
Category: Construction Management Services
Approved Budget for the Contract: PHP 8,108,884.47 
Delivery Period: 150 Day/s
Client Agency:

Contact Person: EVELYN COLUMBRES MALIGAD
BAC Secretariat
Old Rotary Park, Fort San Pedro, Iloilo City
Iloilo City
Iloilo
Philippines 5000
63-033-3351878 Ext.0
63-033-3369542
evelyn.maligad@yahoo.com
Status Awarded
Associated Components 6
Bid Supplements 1
Document Request List 8
Date Published 18/01/2021
Last Updated / Time 01/04/2022 14:09 PM
Closing Date / Time 08/02/2021 09:30 AM

Description
 
Republic of the Philippines
Department of Environment and Natural Resources
FORESTLAND MANAGEMENT PROJECT
Province of Iloilo, Region VI

BILL OF QUANTITIES
Subproject Title/Name Construction of Guinbonyugan Pathway
Category
Sub-Project Number
Physical Test 1.079 km
Brgy./Mun./Province Jalaur Subwatershed, Municipality of Calinog, Iloilo, Region 6
Total Estimated Subproject Cost (PHP) 8,108,884.47
Project Description: Implementation Mode by contract
"Construction of Guinbonyugan Pathway with a total length of 1.079 Km. The maximum grade of the Pathway ranges from 30% to 39% higher than the grade criteria. The carriageway of all section is paved with 1.5 meter wide of Portland Cement Concrete Pavement (PCCP) whose thickness is 0.15 meter and 0.1 meter thick of subbase course, In critical curve, the PCCP pavement it widened to 2.0 to serve as a Parkway. Side drainage and cross structures were also provided. The subproject is located in the Jalaur Subwatershed, Municipality of Calinog, Iloilo.
" Project Duration 150 Calendar Days (w/ 30 unworkable days)
Equipment Needed
Backhoe,0.98 cu.m., 138 hp
Tractor
Cargo Truck, 6 tons, 195 hp
Dump Truck 4 to 6 cu. Yard w/ winch
Walk Behind Roller, Vibratory,0ne tonner
Plate Compactor, Vibratory, 5 hp
Concrete Vibrator, 50mm dia., Gas Driven
Concrete Screeder
Portable Asphalt kettle
Bar Cutter, 20mm dia.
Concrete Saw, 12", 5 lpm, Gas
One Bagger Mixer
Welding Machine
Water Truck/Pump, 16000 lit
ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST


PART A OTHER GENERAL REQUIREMENTS
A.1.1 (1) Construction of Combined Field Office,Laboratory and Living Quarters Building for the Engineer,40 sq.m. Including furniture,chairs and building maintenance. 40 sq.m
TOTAL OF PART A

PART B OTHER GENERAL REQUIREMENTS
B.4 (8) Permanent Monuments and Markers 1 ea.
B.5 Project Billboard / Signboard 2 ea.
B.7 Ocupational Safety and Health Program 1 L.S.
B.9 Mobilization / Demobilization 1 L.S.

TOTAL OF PART B

PART C EARTHWORK
100 (1) Clearing and Grubbing w/ Stripping 0.64 ha.
102 (2)a Roadway Excavation (Surplus Common), including Disposal 1,584 cu.m.
102 (3)a Roadway Excavation (Surplus Soft Rock) 475 cu.m.
103 (1)a Structure Excavation (Manual) 207 cu.m.
103 (6) Pipe Culvert and Drainage Excavation 9 cu.m.
104 (1)b Embankment from Roadway Excavation 890 cu.m.
105 (2) Subgrade Preparation (Existing Pavement) 1,618 sq.m.

TOTAL OF PART C

PART D SUBBASE AND BASE COURSE
200 Aggregate Subbase Course, 0.10 m. thk. 162 cu.m.

TOTAL OF PART D

PART E SURFACE COURSES
311 (1)a.1.1 PCCP, 0.15m. thk.,3000 psi. 1,618 sq.m.

TOTAL OF PART E

Part G DRAINAGE AND SLOPE PROTECTION
404 Reinforcing Steel, Grade 40 506 kg.
405 (1)a Structural Concrete, 3000 psi,28 days, including Formworks 94 cu.m.
500 (1)c Pipe Culvert,910 mm dia.,including Sand Bedding and concrete collar 6 lm.
507 (1) Rubble Masonry w/ 4" dia. PVC weepholes (staggered) including filters 204 cu.m.
510 (1) Bed Course Granular Material (Gravel Bedding) 1 cu.m.
515 (3) Structural Backfill (Common Soil) 12 cu.m.

TOTAL OF PART G

Part H MISCELLANEOUS STRUCTURES
613(1)a Preformed Construction Expansion For Expansion Joint 3 sq.m
613(1)b Concrete Joint Sealant (Hot Poured Elastic) for Control Joints 135 kg.

TOTAL OF PART H

TOTAL ESTIMATED SUBPROJECT COST
submitted by:

Name of Represntative of Bidder
Position
Name of Bidder

Pre-Bid Conference January 27, 2021 at 9:30AM
Submission & Opening of Bids - February 8, 2021 at 9:30AM
Cost of Bid Docs - P8,500.00

Line Items
Item No.Product/Service NameDescriptionQuantityUOMBudget (PHP)
1Construction of Guinbunyugan PathwayPathway1Lot8,108,884.47
Pre-bid Conference
Date Time Venue
27/01/2021 9:30:00 AM DENR, PENRO, iloilo
Old Rotary Park, Brgy. Concepcion, iloilo City

Created by EVELYN COLUMBRES MALIGAD
Date Created 17/01/2021
   

The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party.

  © 2004-2024  DBM Procurement Service. All rights reserved.  
Help |
Contact Us | Sitemap