Reference Number |
7392591 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
Early Procurement Activity for Cy 2021 for the Construction of Brgy. Panuran, Lambunao to Brgy. Aglobong, Janiuay Pathway of PENRO, Iloilo |
Area of Delivery |
Iloilo |
Solicitation Number: |
2020-61 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
National Competitive Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 23,724,630.20
|
Delivery Period: |
240 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Closed |
Associated Components |
5 |
Bid Supplements |
2 |
Document Request List |
13 |
Date Published |
31/12/2020 |
Last Updated / Time |
15/01/2021 11:58 AM |
Closing Date / Time |
20/01/2021 15:30 PM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region VI BILL OF QUANTITIES Subproject Title/Name Construction of Panuran,Lambunao-Brgy. Aglobong,Janiuay Pathway Category Sub-Project Number Physical Test 4,100.27 km Brgy./Mun./Province Ulian Subwatershed, Municipality of Lambunao, Iloilo, Region 6 Total Estimated Subproject Cost (PHP) 23,724,630.21 Project Description: Implementation Mode by contract "Construction of Brgy. Panuran,Lambunao-Brgy. Aglobong,Janiuay Pathway with a total length of 4,100.27 Km.It is provided with 1.5 meter width of Portland Cement Concrete Pavement (PCCP) whose thickness is 0.15 meter over a 0.1 meter thick of sub base course materials.It is provided with six (6) 1-line of cross drainage and one (1) 2-lines of cross drainage,culvert whose size is 0.91 meter diameter Reinforced Concrete Pipe Culvert (RCPC) and three (3) surface drainage.The cross drainage is provided with structure to avoid clogging.The maximum slope of the pathway is 35% in the start to about 300 meters.The subproject is located in the Ulian Subwatershed, Municipality of Lambunao, Iloilo,Region 6. " Project Duration 240 Calendar Days (w/ 30 unworkable days) Equipment Needed Backhoe,0.52 cu.m., 90 hp Wheel Tractor Walk Behind Roller, Vibratory Welding Machine Cargo Truck, 6 tons, 195 hp Plate Compactor, Vibratory, 5 hp Concrete Vibrator, 50mm dia., Gas Driven Concrete Screeder Portable Asphalt kettle One Bagger Mixer Bar Cutter, 20mm dia. Concrete Saw,12",5 lpm,Gas ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST PART A FACILITIES FOR THE ENGINEER A.1.1 (1) Construction of Field Office for the Engineer,40 sq.m. 40 sq.m TOTAL OF PART A PART B OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monuments and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S. B.9 Mobilization / Demobilization 1 L.S. TOTAL OF PART B PART C EARTHWORK 100 (1) Clearing and Grubbing w/ Stripping 2 ha. 102 (2)a Roadway Excavation (Surplus Common), including Disposal 6,716 cu.m. 102 (3)a Roadway Excavation (Surplus Soft Rock) 1,000 cu.m. 103 (1)a Structure Excavation,common Soil 476 cu.m. 104 (1)b Embankment from Roadway Excavation 1,270 cu.m. 104 (1)b Subgrade Preparation 6,165 sq.m. TOTAL OF PART C PART D SUBBASE AND BASE COURSE 200 Aggregate Subbase Course, 0.10 m. thk. 617 cu.m. TOTAL OF PART D PART E SURFACE COURSES 311 (1)a.1.1 PCC Pavement, 0.15m. thk.,3000 psi.,21 days 6,165 sq.m. TOTAL OF PART E Part G DRAINAGE AND SLOPE PROTECTION 404 Reinforcing Steel, Grade 40 2,584 kg. 405 (1)a Structural Concrete, 3000 psi,21 days, including Formworks 25 cu.m. 405 (1)b Structural Concrete, 3000 psi,21 days, for Lined Canal 355 cu.m. 500 (1)e Pipe Culvert,910 mm dia.,including Sand Bedding and concrete collar 16 lm. 503 (b) Cross Drainage Steel Grating w/ Frame,65mm x 1000mm 3 set 507 (1) Rubble Masonry, including 100mm PVC weepholes and Gravel filter 31 cu.m. 510 (1) Bed Course Granular Material (Gravel Bedding) 271 cu.m. 515 (3) Structural Backfill (Common Soil) 52 cu.m. TOTAL OF PART G Part H MISCELLANEOUS STRUCTURES 613(1)a Preformed Construction Expansion For Expansion Joint 32 sq.m 613(1)b Concrete Joint Sealant (Hot Poured Elastic) for Control Joints 1,026 kg. TOTAL OF PART H TOTAL ESTIMATED SUBPROJECT COST Pre-Bid Conference - January 8, 2021 at 3:30PM Submission and Opening of Bids - January 20, 2021 at 3:30PM Cost of Bid docs - P24,000.00 |
|
Pre-bid Conference |
08/01/2021 |
3:30:00 PM |
DENR, PENRO, ILOILO Old Rotary Park, Brgy. Concepcion, Iloilo City |
|
|
Other Information |
Funding Source Fund 102 For Year 1 CY 2021 amounting to P13,048,546.61 For Year 2 CY 2022 amounting to 10,676,083.59 Total amount of ABC 23,724,630.20 |
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
30/12/2020 |
|
|
|
|
|