Invitation to Bid (ITB)
Reference Number 7392505
Procuring Entity DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO
Title Early Procurement Activity for Cy 2021 for the Concreting of Brgy. Garangan Access Road of PENRO, Iloilo
Area of Delivery Iloilo

Solicitation Number: 2020-59
Trade Agreement: Implementing Rules and Regulations
Procurement Mode: National Competitive Bidding
Classification: Civil Works
Category: Construction Management Services
Approved Budget for the Contract: PHP 24,548,676.80 
Delivery Period: 240 Day/s
Client Agency:

Contact Person: EVELYN COLUMBRES MALIGAD
BAC Secretariat
Old Rotary Park, Fort San Pedro, Iloilo City
Iloilo City
Iloilo
Philippines 5000
63-033-3351878 Ext.0
63-033-3369542
evelyn.maligad@yahoo.com
Status Closed
Associated Components 5
Bid Supplements 1
Document Request List 10
Date Published 31/12/2020
Last Updated / Time 06/01/2021 15:12 PM
Closing Date / Time 20/01/2021 10:00 AM

Description
 
Republic of the Philippines
Department of Environment and Natural Resources
FORESTLAND MANAGEMENT PROJECT
Province of Iloilo, Region VI

BILL OF QUANTITIES
Subproject Title/Name Concreting of Brgy. Garangan Access Road
Category
Sub-Project Number
Physical Test 1.620 km
Brgy./Mun./Province Jalaur Subwatershed, Municipality of Calinog, Iloilo, Region 6
Total Estimated Subproject Cost (PHP) 24,548,676.80
Project Description: Implementation Mode by contract
"Concreting of Brgy. Garangan Access Road with a total length of 1.62 Km.It is provided with 3 meter width of Portland Cement Concrete Pavement (PCCP) whose thickness is 0.20 meter over a 0.15 meter thick of subbase course materials.It is provided with Nine (9) lines of cross drainage whose size is o.91 meter diameter Reinforced Concrete Pipe Culvert (RCPC).The cross drainage is provided with structure to avoid clogging.The maximum slope of the access road is 29.47%. The subproject is located in the Jalaur Subwatershed, Municipality of Calinog, Iloilo,Region 6
" Project Duration 240 Calendar Days (w/ 30 unworkable days)
Equipment Needed
Dozer (D6),175 hp
Batching plant
Backhoe,0.98 cu.m.,138 hp, w/ attachment
Loader,1 cu.m.,77.78 hp
Road truck,9 cu.m.yd.,275 hp Portable Asphalt kettle
Transit Mixer 3.5 cu.m.160 hp Bar Cutter 20mm dia.
Grader,125 hp Concrete Saw 12" 5lpm gas
Concrete Screeder 4 Wheel drive vehicle
Cargo Truck,6 Tons,195 hp
Plate compactor Vibratory 5hp
Compactor,Vibratory,Steel Drum, 10mt,130 hp
One Bagger Mixer
Water Truck/Pump,16000 lit.
Concrete Vibrator 50mm dia. Gas driven
ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST


PART A FACILITIES FOR THE ENGINEER
A.1.1 (1) Construction of Combined Field Office,Laboratory and Living Quarters Building for the Engineer,40
sq.m.including furniture,chairs and building maintenance 40 sq.m
TOTAL OF PART A

PART B OTHER GENERAL REQUIREMENTS
B.4 (8) Permanent Monuments and Markers 1 ea.
B.5 Project Billboard / Signboard 2 ea.
B.7 Ocupational Safety and Health Program 1 L.S.
B.9 Mobilization / Demobilization 1 L.S.

TOTAL OF PART B

PART C EARTHWORK
100 (1) Clearing and Grubbing w/ Stripping 1.04 ha.
102 (2)a Roadway Excavation (Surplus Common), including Disposal 2,610 cu.m.
102 (3)a Roadway Excavation (Surplus Soft Rock) 522 cu.m.
103 (1)a Structure Excavation (Manual) 294 cu.m.
103 (6) Pipe Culvert and Drainage Excavation 55 cu.m.
104 (1)b Embankment from Roadway Excavation 1,575 cu.m.
105 (2) Subgrade Preparation (Existing Pavement) 5,056 sq.m.

TOTAL OF PART C

PART D SUBBASE AND BASE COURSE
200 Aggregate Subbase Course, 0.15 m. thk. 758 cu.m.

TOTAL OF PART D

PART E SURFACE COURSES
311 (1)a.1.1 PCCP , 0.20m. thk.,3000 psi, w/ (Fiber and Plastesizer),14 days 5,056 sq.m.

TOTAL OF PART E

Part G DRAINAGE AND SLOPE PROTECTION
404 Reinforcing Steel, Grade 40 1,529 kg.
405 (1)a Structural Concrete, 3000 psi, 21 days, including Formworks 134 cu.m.
500 (1)c Pipe Culvert,910 mm dia.,including Sand Bedding 25 lm.
503 (a) Cross-Drainage Steel Grating W/ Frame,650mm x 3000mm 4 set
507 (1) Rubble Masonry w/ 4" dia. PVC weepholes (staggered) 496 cu.m.
510 (1) Bed Course Granular Material (Gravel Bedding) 4 cu.m.
515 (3) Structural Backfill (Common Soil) 53 cu.m.

TOTAL OF PART G

Part H MISCELLANEOUS STRUCTURES
613(1)a Preformed Construction Expansion For Expansion Joint 17 sq.m
613(1)b Concrete Joint Sealant (Hot Poured Elastic) for Control Joints 305 kg.

TOTAL OF PART H

TOTAL ESTIMATED SUBPROJECT COST
Pre-Bid Conference - January 8, 2021 at 10:00AM
Submission and Opening of Bids - January 20, 2021 at 10:00AM
Cost of Bid docs- P25,000.00

Pre-bid Conference
Date Time Venue
08/01/2021 10:00:00 AM DENR, PENRO, ILOILO
Old Rotary Park, Brgy. Concepcion, Iloilo City
Other Information
Funding Source - Fund 102 - For Year 1 CY 2021 amounting to P13,501,772.24
For Year 2 CY 2022 amounting to P11,046,904.56
Total amount of ABC P24,548,676.80

Created by EVELYN COLUMBRES MALIGAD
Date Created 30/12/2020
   