Invitation to Bid (ITB)
Reference Number 7391939
Procuring Entity DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO
Title Early Procurement Activity of CY 2021 for the Construction of Atimonan-Aglobong-Panuran Pathway of PENRO, Iloilo
Area of Delivery Iloilo

Solicitation Number: 2020-58
Trade Agreement: Implementing Rules and Regulations
Procurement Mode: National Competitive Bidding
Classification: Civil Works
Category: Construction Management Services
Approved Budget for the Contract: PHP 65,370,322.95 
Delivery Period: 360 Day/s
Client Agency:

Contact Person: EVELYN COLUMBRES MALIGAD
BAC Secretariat
Old Rotary Park, Fort San Pedro, Iloilo City
Iloilo City
Iloilo
Philippines 5000
63-033-3351878 Ext.0
63-033-3369542
evelyn.maligad@yahoo.com
Status Closed
Associated Components 5
Bid Supplements 3
Document Request List 12
Date Published 30/12/2020
Last Updated / Time 15/01/2021 11:56 AM
Closing Date / Time 19/01/2021 15:30 PM

Description
 
Republic of the Philippines
Department of Environment and Natural Resources
FORESTLAND MANAGEMENT PROJECT
Province of Iloilo, Region VI

BILL OF QUANTITIES
Subproject Title/Name Construction of Atimonan-Aglobong-Panuran Pathway
Category
Sub-Project Number
Physical Test 8,132.59 km
Brgy./Mun./Province Suage Subwatershed, Municipality of Januiay, Iloilo, Region 6
Total Estimated Subproject Cost (PHP) 65,370,322.95
Project Description: Implementation Mode by contract
"Construction of Atimonan-Aglobong-Panuran Pathway with a total length of 8,132.59 Km.It is provided with 1.5 meter width of Portland Cement Concrete Pavement (PCCP) whose thickness is 0.15 meter over a 0.1 meter thick of subbase materials.It is provided with forty four (44) lines of cross and sub-surface drainage culvert whose size is 0.91 meter diameter Reinforced Concrete Pipe Culvert (RCPC) and 2-3 x 3 Box Culvert.The cross drainage is provided with structure to avoid clogging.The maximum slope of the slope of the pathway is 35% in the start to about 300 meters. The subproject is located in the Suage Subwatershed, Municipality of Januiay, Iloilo,Region 6.
" Project Duration 360 Calendar Days (w/ 60 unworkable days)
Equipment Needed
Backhoe,0.52 cu.m., 90 hp
Wheel Tractor
Walk Behind Roller, Vibratory
Welding Machine
Cargo Truck, 6 tons, 195 hp
Plate Compactor, Vibratory, 5 hp
Water Truck/Pump, 16000 lit
Concrete Vibrator, 50mm dia., Gas Driven
Concrete Screeder
Portable Asphalt kettle
One Bagger Mixer
Bar Cutter, 20mm dia.
Concrete Saw, 12", 5 lpm, Gas

ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST


PART A FACILITIES FOR THE ENGINEER
A.1.1 (1) Construction of Field Office for the Engineer,40 sq.m 40 sq.m

PART B OTHER GENERAL REQUIREMENTS
B.4 (8) Permanent Monuments and Markers 1 ea.
B.5 Project Billboard / Signboard 2 ea.
B.7 Ocupational Safety and Health Program 1 L.S.
B.9 Mobilization / Demobilization 1 L.S.

TOTAL OF PART B

PART C EARTHWORK
100 (1) Clearing and Grubbing w/ Stripping 5.00 ha.
102 (2)a Roadway Excavation (Surplus Common), including Disposal 25,941 cu.m.
102 (3)a Roadway Excavation (Surplus Soft Rock) 1,000 cu.m.
103 (1)a Structure Excavation,Common Soil 997 cu.m.
104 (1)b Embankment from Roadway Excavation 5,561 cu.m.
104 (1)b Subgrade Preparation 12,241 sq.m.

TOTAL OF PART C

PART D SUBBASE AND BASE COURSE
200 Aggregate Subbase Course, 0.10 m. thk. 1,338 cu.m.

TOTAL OF PART D

PART E SURFACE COURSES
311 (1)a.1.1 PCC Pavement, 0.15m. thk.,3000 psi, 21 days 12,241 sq.m.

TOTAL OF PART E

Part F DRAINAGE AND SLOPE PROTECTION
404 Reinforcing Steel, Grade 40 14,794 kg.
405 (1)a Structural Concrete, 3000 psi,21 days, including Formworks 166 cu.m.
405 (1)b Structural Concrete, 3000 psi, 21 days, for lined Canal 555 cu.m.
500 (1)e Pipe Culvert,910 mm dia.,including Sand Bedding 54 lm.
503 (b) Cross Drainage Steel Grating w/ frame,65mm x 1000mm 17 set
507 (1) Rubble Masonry,including 100mm PVC weephole and Grvel Filler 1,246 cu.m.
510 (1) Bed Course Granular Material (Gravel Bedding) 30 cu.m.
515 (3) Structural Backfill (Common Soil) 197 cu.m.

TOTAL OF PART F

Part G MISCELLANEOUS STRUCTURES
613(1)a Preformed Construction Expansion For Expansion Joint 82 sq.m
613(1)b Concrete Joint Sealant (Hot Poured Elastic) for Control Joints 1,525 kg.

TOTAL OF PART G

TOTAL ESTIMATED SUBPROJECT COST

Pre-Bid Conference - January 7, 2021 at 3:30PM
Submission & Opening of Bids - January 19, 2021 at 3:30PM
Cost of Bid docs - 65,000.00

Pre-bid Conference
Date Time Venue
07/01/2021 3:30:00 PM DENR, PENRO, Iloilo
Old Rotary Park, Brgy. Concepcion, Iloilo City
Other Information
Fund source is Fund 102 For Year 1 CY 2021 amounting to P29,416,645.33
For Year 2 Cy 2022 amounting to P35,953,677.62
Total Amount of ABC AMOUNTING TO 65,370,322.95

Created by EVELYN COLUMBRES MALIGAD
Date Created 29/12/2020
   

The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party.

  © 2004-2024  DBM Procurement Service. All rights reserved.  
Help |
Contact Us | Sitemap