Reference Number |
7391939 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
Early Procurement Activity of CY 2021 for the Construction of Atimonan-Aglobong-Panuran Pathway of PENRO, Iloilo |
Area of Delivery |
Iloilo |
Solicitation Number: |
2020-58 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
National Competitive Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 65,370,322.95
|
Delivery Period: |
360 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Closed |
Associated Components |
5 |
Bid Supplements |
3 |
Document Request List |
12 |
Date Published |
30/12/2020 |
Last Updated / Time |
15/01/2021 11:56 AM |
Closing Date / Time |
19/01/2021 15:30 PM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region VI BILL OF QUANTITIES Subproject Title/Name Construction of Atimonan-Aglobong-Panuran Pathway Category Sub-Project Number Physical Test 8,132.59 km Brgy./Mun./Province Suage Subwatershed, Municipality of Januiay, Iloilo, Region 6 Total Estimated Subproject Cost (PHP) 65,370,322.95 Project Description: Implementation Mode by contract "Construction of Atimonan-Aglobong-Panuran Pathway with a total length of 8,132.59 Km.It is provided with 1.5 meter width of Portland Cement Concrete Pavement (PCCP) whose thickness is 0.15 meter over a 0.1 meter thick of subbase materials.It is provided with forty four (44) lines of cross and sub-surface drainage culvert whose size is 0.91 meter diameter Reinforced Concrete Pipe Culvert (RCPC) and 2-3 x 3 Box Culvert.The cross drainage is provided with structure to avoid clogging.The maximum slope of the slope of the pathway is 35% in the start to about 300 meters. The subproject is located in the Suage Subwatershed, Municipality of Januiay, Iloilo,Region 6. " Project Duration 360 Calendar Days (w/ 60 unworkable days) Equipment Needed Backhoe,0.52 cu.m., 90 hp Wheel Tractor Walk Behind Roller, Vibratory Welding Machine Cargo Truck, 6 tons, 195 hp Plate Compactor, Vibratory, 5 hp Water Truck/Pump, 16000 lit Concrete Vibrator, 50mm dia., Gas Driven Concrete Screeder Portable Asphalt kettle One Bagger Mixer Bar Cutter, 20mm dia. Concrete Saw, 12", 5 lpm, Gas ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST PART A FACILITIES FOR THE ENGINEER A.1.1 (1) Construction of Field Office for the Engineer,40 sq.m 40 sq.m PART B OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monuments and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S. B.9 Mobilization / Demobilization 1 L.S. TOTAL OF PART B PART C EARTHWORK 100 (1) Clearing and Grubbing w/ Stripping 5.00 ha. 102 (2)a Roadway Excavation (Surplus Common), including Disposal 25,941 cu.m. 102 (3)a Roadway Excavation (Surplus Soft Rock) 1,000 cu.m. 103 (1)a Structure Excavation,Common Soil 997 cu.m. 104 (1)b Embankment from Roadway Excavation 5,561 cu.m. 104 (1)b Subgrade Preparation 12,241 sq.m. TOTAL OF PART C PART D SUBBASE AND BASE COURSE 200 Aggregate Subbase Course, 0.10 m. thk. 1,338 cu.m. TOTAL OF PART D PART E SURFACE COURSES 311 (1)a.1.1 PCC Pavement, 0.15m. thk.,3000 psi, 21 days 12,241 sq.m. TOTAL OF PART E Part F DRAINAGE AND SLOPE PROTECTION 404 Reinforcing Steel, Grade 40 14,794 kg. 405 (1)a Structural Concrete, 3000 psi,21 days, including Formworks 166 cu.m. 405 (1)b Structural Concrete, 3000 psi, 21 days, for lined Canal 555 cu.m. 500 (1)e Pipe Culvert,910 mm dia.,including Sand Bedding 54 lm. 503 (b) Cross Drainage Steel Grating w/ frame,65mm x 1000mm 17 set 507 (1) Rubble Masonry,including 100mm PVC weephole and Grvel Filler 1,246 cu.m. 510 (1) Bed Course Granular Material (Gravel Bedding) 30 cu.m. 515 (3) Structural Backfill (Common Soil) 197 cu.m. TOTAL OF PART F Part G MISCELLANEOUS STRUCTURES 613(1)a Preformed Construction Expansion For Expansion Joint 82 sq.m 613(1)b Concrete Joint Sealant (Hot Poured Elastic) for Control Joints 1,525 kg. TOTAL OF PART G TOTAL ESTIMATED SUBPROJECT COST
Pre-Bid Conference - January 7, 2021 at 3:30PM Submission & Opening of Bids - January 19, 2021 at 3:30PM Cost of Bid docs - 65,000.00 |
|
Pre-bid Conference |
07/01/2021 |
3:30:00 PM |
DENR, PENRO, Iloilo Old Rotary Park, Brgy. Concepcion, Iloilo City |
|
|
Other Information |
Fund source is Fund 102 For Year 1 CY 2021 amounting to P29,416,645.33 For Year 2 Cy 2022 amounting to P35,953,677.62 Total Amount of ABC AMOUNTING TO 65,370,322.95 |
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
29/12/2020 |
|
|
|
|
|