Reference Number |
7056275 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
CONSTRUCTION OF CANAUILLIAN HANGING BRIDGE OF PENRO, Iloilo |
Area of Delivery |
Iloilo |
Solicitation Number: |
2020-27 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
Public Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 7,920,969.67
|
Delivery Period: |
150 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Awarded |
Associated Components |
5 |
Bid Supplements |
0 |
Document Request List |
13 |
Date Published |
20/06/2020 |
Last Updated / Time |
31/10/2020 16:55 PM |
Closing Date / Time |
13/07/2020 13:00 PM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region VI SUBPROJECT PROGRAM OF WORK Subproject Title/Name Construction of Canauillian Hanging Bridge Category Sub-Project Number Physical Test 1 Unit at 70m Brgy./Mun./Province Suage Subwatershed, Municipality of janiuay, Iloilo, Region 6 Total Estimated Subproject Cost (PHP) 7,920,969.67 Project Description: Implementation Mode by contract Construction of Canauillian Hanging Bridge with a span of 70 meters from Tower A to Tower B. It is consist of 1 inch diameter wire rope as upper, with 3/4 inch lower cable and 1/2 inch diameter hanger wire rope cable. The bottom cable is about 10meters above the creek bed and the maximum water level is about 3 meters above the bed. It is located in Suage Subwatershed, Municipality of Janiuay, Iloilo, Region 6. Project Duration 150 Calendar days (w/ 30 unworkable days) Equipment Needed Winch, 1 ton Bar Cutter, 20mm dia Chain Block, 5 ton Welding Machine, 300 amp Cargo Truck, 6 tons, 195 hp Genset, 100 kw 4 Wheel drive Vehicle Plate Compactor, Vibratory, 5hp Drill bit Machine Dumptruck, 6cu.m.yd. 275 hp Mixer, 1 Bagger Loader, 1cu.m.,77.78hp ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST PART A FACILITIES FOR THE ENGINEER A.1.1 (1) Construction of Combined Field Office, Laboratory and Living Quarters Building for the Engineer, 40 sq.m. 40 sq.m PART B OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monument and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S B.9 Mobilization / Demobilization 1 L.S PART C EARTHWORK 100 (1) Clearing and Grubbing (Equipment Rental) 0.2 ha. 103 (1)a Strucrute Excavation (Common Soil w/ Cobbles and Boulders) (Equipment Rental) 172.7 cu.m PART D BRIDGE CONSTRUCTION 403 (5) Structural Steel, Furnished ,Fabricated, and Erected 403 (5)a.1 Channel (100mm x 50mm x 6mm), w/ 150x75c6.5mm Steel Channel Stringer (including 6.5mm Steel Flat Bar Bracing and Half HDPE) 140 ln.m 403 (5)a.2 Channel (50mm x 50mm x 3.5mm x 1.7m. length). Including Steel Plate, Expansion Bolt and other Metal Work 140 pc 403 (5)a.3 Lateral Bracing (30 mm x 30 mm x 5mmx 1.6m. length), including Bolts and Knots 70 pc 403 (5)a.4 Checkered Plate for Flooring (1.2m. X 1m. X 2.3mm) including Ls 30mm x 30mm x 3mm 70 ln.m 403 (5)a.5 Cyclone Wire, 50mm x 50mm x 4.0mm, Ga. 8, w/ 12mm Plain Steel Bar, 12.5mm dia. G.I. Pipe Sleeve, Ls 25mmx25mmx3mm 140 ln.m 404 (1)a Reinforcing Steel Bar, Grade 40 13,085 kg 405 (1)a3 Structural Concrete, 20.68Mpa, including Formworks 78.56 cu.m 405 (6) Structural Concrete, Painting Works 104 sq.m 411 (1) Paint, Steel member and Steel Wire Rope 575 sq.m 507(1) Rubble masonry 121.24 cu.m 510 (1) Bed Course Granular Material (Gravel Bedding) 2.26 cu.m 710 (1) Reinforcing Steel Wire Rope 710 (1)a.1 1 inch dia. Steel wire rope, 6 x 19 (IWRC), Galvanized 317 ln.m 710 (1)a.3 1/2 inch dia. Steel Wire Rope, 6 x 19 (IWRC),Galvanized 559 ln.m 710 (1)a.4 Clamps, Turnbuckles, Thimbles, HDPE Sleeve 1 L.S 1002 (2) 3/4" dia GI Pipe (Schedule 40) 30 ln.m SPL 1 Ladder Rung and Cage 2 Unit SPL 2 Cable Rack (Steel) 4 Unit TOTAL ESTIMATED SUBPROJECT COST Pre-Bid Conference - July 1, 2020 at 11:00AM Submission and Opening of Bids - July 13, 2020 at 11:00AM |
|
Line Items |
1 | Construction of Canauillian Hanging Bridge | Brgy. Canauillian, Janiuay, Iloilo | 1 | Lot | 7,920,969.67 |
|
Pre-bid Conference |
01/07/2020 |
11:00:00 AM |
DENR, PENRO, ILOILO Old Rotary Park, Brgy. Concepcion, Iloilo City |
|
|
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
19/06/2020 |
|
|
|
|
|