Reference Number |
6926563 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
CONSTRUCTION OF MARANDIG IRRIGATION PIPELINE SYSTEM OF PENRO, ILOILO FMP |
Area of Delivery |
Iloilo |
Solicitation Number: |
2020-23 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
Public Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 8,604,419.68
|
Delivery Period: |
180 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Awarded |
Associated Components |
5 |
Bid Supplements |
3 |
Document Request List |
8 |
Date Published |
11/03/2020 |
Last Updated / Time |
28/10/2020 16:39 PM |
Closing Date / Time |
29/05/2020 17:00 PM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region VI BILL OF QUANTITIES Subproject Title/Name Construction of Marandig Irrigation and Pipeline System Category Sub-Project Number Physical Test Brgy./Mun./Province Jalaur Subwatershed, Municipality of Calinog, Iloilo, Region 6 Total Estimated Subproject Cost (PHP) 8,604,419.68 Project Description: Implementation Mode by contract "Construction of Marandig Irrigation and Pipeline System which is in General consist of supply and installation of 4, 850m of HDPE Pipe SDR17, (broken down into, 420m of 63mm nom. Dia., 900m of 50mm nom. Dia., 340m of 40mm nominal dia., 3,110m of 32mm nom. dia., and 80m of 63.5 diameter G.I Pipe Schedule 40). All pipe will be burried 0.4m below the ground, except on crossing of deep creeks and live creeks. It also include supply of 4,000m of 12.5mm dia. HDPE SDR 17 for used of the Farmers/PO’s in watering the agro forest trees. The system also includes the construction of filtration tanks, reservoirs and pressure brakers. All structure are provided with stubouts for connection to 12.5mm dia. HDPE Pipe. This is located in Jalaur subwatershed, municipality of calinog, Iloilo " Project Duration 180 CD (w/ 30 unworkable days) Equipment Needed Bar Cutter Cargo Truck, 6 tons, 195 hp Tractor Welding Machine Welding Machine Plate Compactor, Vibratory, 5 hp Concrete Vibrator, 50mm dia., Gas Driven ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST Part I A.1.1 (1) Construction field office for the Engineer, 40 sq.m 1 ls PART II OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monuments and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S. B.9 Mobilization / Demobilization 1 L.S. TOTAL OF PART B PART III IRRIGATION PIPELINE WORKS A RESERVOIR, FILTRATION, STUBOUT, PRESSURE BREAKER AND VALVE BOX 900 (1) Structural Concrete, 300 psi, 28 days 114.00 cu.m. 902 (1) Reinforcing Steel, Grade 40 4,539 kg 903 (1) Forms and Falseworks 544 sq.m 1016 (1) Waterproofing 204 sq.m 1031 (1) Painting, Concrete 299 sq.m 1046 (1) a CHB Walling, 100 mm thk 64 sq.m 1046 (1) b CHB Walling, 150 mm thk 44 sq.m 1046 (1) b Cement Finish 677 sq.m 1600 (1) Structure Excavation for Structures 195 cu.m 1601 (1)a Structure Backfill for Structures 76 cu.m SPL 1 a Valve Box Steel cocer 1, 45mm x 85mm 2mm thk 18 pc SPL 1 b Valve Box Steel cocer 2, 45mm x 45mm 2mm thk 8 pc SPL 1 c Stubout Cover, 55mm x 1300mm x 2mm thk 8 pc SPL 2 Stub-Out Piping, G.I Fittings, Valves, Nipple 8 lot SPL 3 Pipes and fittings in the reservoir, Filtration, Presure breaker 1 lot B PIPES 1001 (1) a Pipe Hanger, (Including pipe) 4,000 ln.m 1001 (1) b Supply and installation of 32mm nominal dia. HDPE, SDR 17 3,110 ln.m 1001 (1) c Supply and installation of 40mm nominal dia. HDPE, SDR 17 340 ln.m 1001 (1) d Supply and installation of 50mm nominal dia. HDPE, SDR 17 900 ln.m 1001 (1) e Supply and installation of 63mm nominal dia. HDPE, SDR 17 420 ln.m 1001 (2) a Supply and installation of 63mm dia. G.I Pipe Sched. 40 80 ln.m 1600 (2) Structure Excavation, for pipe 388 cu.m 1601 (1) a Structure Backfill, for pipe 376 cu.m 1600 (1) b Sand Envelop for HDPE Pipes 85 cu.m C GATE VALVES 1603 (1) a Gate Valves in Main Pipe, 32mm 12 pc 1603 (1) b Gate Valves in Main Pipe, 40mm 3 pc 1603 (1) c Gate Valves in Main Pipe, 50mm 18 pc 1603 (1) d Gate Valves in Main Pipe, 63mm 3 pc E PIPE HANGER, (INCLUDING PIPE) SPL4a Pipe hanger, (Including G.I. Pipe, Sch. 40) type A 2 unit SPL4a Pipe hanger, (Including G.I. Pipe, Sch. 40) type C 2 unit F PIPE ALIGNMENT MARKERS, 0.15 X 0.39 SPL5 Pipe Alignment Markers, 0.15 x 0.40 48 pc G INTAKE STRUCTURES 900 (1) Structural Concrete, 3000 psi, 28 days 2 cu.m 1001 (2)a Supply and Installation of 150mm dia PVC Pipe, Series 1000, Perporated 18 ln.m 1002 (2)b Supply and Installation of 63mm G.I Pipe, Scs 40. including fitting 24 ln.m 1040 (1) welded steel Matting 25 sq.m 1600 (1) Structure Excavation 5 cu.m 1603 (3)d 63mm Gate Valves, Including attachment 2 pc 1713 (1) Rubble Masonry 6 cu.m SPL6 Rubble Masonry 10 cu.m H PIPE STORAGE HOUSE 1 unit TOTAL ESTIMATED SUBPROJECT COST PRE-BID CONFERENCE - March 20, 2020 @ 3:30PM Opening of Bids - April 2, 2020 @ 2:00PM Cost of Bidding Documents - P8,500.00 |
|
Line Items |
1 | Construction of Marandig Irrigation Pipeline Syst | Irrigation Pipeline System at Brgy. Marandig, Calinog, Iloilo | 1 | Lot | 8,604,419.68 |
|
Pre-bid Conference |
20/03/2020 |
3:30:00 PM |
DENR, PENRO, ILOILO Old Rotary Park, Brgy. Concepcion, Iloilo City |
|
|
|
|
Remarks |
Submission and Opening of Bids on May 29, 2020 at 3:30PM
|
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
10/03/2020 |
|
|
|
|
|