Reference Number |
6921180 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
CONSTRUCTION OF BARASALON HANGING BRIDGE OF PENRO, ILOILO FMP |
Area of Delivery |
Iloilo |
Solicitation Number: |
2020-17 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
Public Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 12,235,586.95
|
Delivery Period: |
150 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Awarded |
Associated Components |
5 |
Bid Supplements |
3 |
Document Request List |
9 |
Date Published |
09/03/2020 |
Last Updated / Time |
31/10/2020 17:09 PM |
Closing Date / Time |
28/05/2020 17:00 PM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region 6 BILL OF QUANTITIES SUBPROJECT PROGRAM OF WORK Construction of Barasalon Hanging Bridge No.1 Category Sub-Project Number Physical Target 1 unit at 100 m. Brgy./Mun./Province Suage sub-watershed, Municipality of Janiuay, Iloilo, Region 6 Total Estimated subproject Cost 12,235,586.95 Project Description: Implementation Mode By Contract Construction of Barasalon Hanging Bridge I with a spa of 60 meters from Tower A to Tower B. It is Consist of 1 inch diameter wire rope as upper and lower cable and 1/2 inch diameter hanger wire rope Cable. The bottom cable is about 10 meters above the creek bed and the maximum water level is about 3 meters above the bed. It is located in suage Subwatershed, Minicipality of Janiuay, Iloilo Project Duration 150 Calendar days (W/ 30 unworkable days) Equipment Needed Winch, 1Ton Chain Block, 5 ton Cargo Truck, 6 tons, 195 hp 4 Wheel Drive Vehicle Drill Bit Machine Mixer, 1 Bagger Concrete vibrator Bar Cutter, 20mm dia. Welding Machine, 300 amp Genset, 20 kw Plate Compactor, Vibratory , 5 hp Dumptruck, 9 cu.m. yd., 275 hp Loader, 0.1 cu.m., 77.78 hp ITEM NO. DESCRIPTION % Wt QUANTITY UNIT UNIT COST TOTAL COST PART A FACILITIES FOR THE ENGINEER A.1.1 (1) Construction of Combined Field Office, Laboratory and Living Quarters Building for the Engineer, 40 sq.m. 40 sq.m. PART B OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monument and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S. B.9 Mobilization / Demobilization 1 L.s. PART C EARTHWORK 100 (1) Clearing and Grubbing 0.2 ha. 103 (1)a Structure Excavation (Common Soil w/ cobbles and boulders) 167 cu.m. PART D BRIDGE CONSTRUCTION 403 (5) Structural Steel, Furnished ,Fabricated, and Erected 403 (5)a.1 Channel (100mm x 50mm x 6mm), w/ 150x75c6.5mm Steel Channel Stringer (including 6.5mm Steel Flat Bar Bracing and Half HDPE) 200 ln.m. 403 (5)a.2 Channel (50mm x 50mm x 3.5mm x 1.7m. length). Including Steel Plate, Expansion Bolt and other Metal Work 202 pc. 403 (5)a.3 Lateral Bracing (30 mm x 30 mm x 5mmx 1.6m. length), including Bolts and Knots 100 pc. 403 (5)a.4 Checkered Plate for Flooring (1.2m. X 1m. X 2.3mm) including Ls 30mm x 30mm x 3mm 100 ln.m. 403 (5)a.5 Cyclone Wire, 50mm x 50mm x 4.0mm, Ga. 8, w/ 12mm Plain Steel Bar, 12.5mm dia. G.I. Pipe Sleeve, Ls 25mmx25mmx3mm 200 ln.m. ITEM NO. DESCRIPTION QUANTITY UNIT 404 (1)a Reinforcing Steel Bar, Grade 40 16,310.00 kg. 405 (1)a3 Structural Concrete, 20.68Mpa, including Formworks 92 cu.m. 405 (6) Structural Concrete, Painting Works 157.45 sq.m. 411 (1) Paint, Steel member and Steel Wire Rope 365.9 sq.m. 507(1) Rubble masonry 342 cu.m. 510 (1) Bed Course Granular Material (Gravel Bedding) 5 cu.m. 710 (1) Reinforcing Steel Wire Rope 710 (1)a.1 1 inch dia. Steel Wire Rope, 6x19 (IWRC), Galvanized 440 ln.m. 710 (1)a.2 1/2 inch dia. Steel Wire Rope, 6x19 (IWRC), Galvanized 952 ln.m. 710 (1)a.3 Clamps, Turnbuckles, Thimbles, HDPE Sleeve 1 l.s. 1002 (2) 3/4" dia GI Pipe (Schedule 40) 260 l.m SPL 1 Ladder Rung and Cage 2 Unit SPL 2 Cable Rack (Steel) 4 Unit TOTAL OF PART D - TOTAL LOCAL CONTRACTORS ARE PREFERRED |
|
Line Items |
1 | Construction of Barasalon Hanging Bridge | Brgy. Barasalon, Janiuay, Iloilo | 1 | Lot | 12,235,586.95 |
|
|
|
|
Remarks |
Submission and Opening of Bids on May 28, 2020 at 3:30PM
|
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
08/03/2020 |
|
|
|
|
|