Reference Number |
6921063 |
Procuring Entity |
DEPARTMENT OF ENVIRONMENT AND NATURAL RES. - PENRO, ILOILO |
Title |
CONSTRUCTION OF CABATANGAN IRRIGATION PIPELINE SYSTEM OF PENRO, ILOILO FMP |
Area of Delivery |
Iloilo |
Solicitation Number: |
2020-15 |
Trade Agreement: |
Implementing Rules and Regulations |
Procurement Mode: |
Public Bidding |
Classification: |
Civil Works |
Category: |
Construction Management Services |
Approved Budget for the Contract: |
PHP 36,355,535.31
|
Delivery Period: |
480 Day/s |
Client Agency: |
|
|
Contact Person: |
EVELYN COLUMBRES MALIGAD BAC Secretariat Old Rotary Park, Fort San Pedro, Iloilo City Iloilo City Iloilo Philippines 5000 63-033-3351878 Ext.0 63-033-3369542 evelyn.maligad@yahoo.com |
|
Status |
Awarded |
Associated Components |
5 |
Bid Supplements |
3 |
Document Request List |
10 |
Date Published |
09/03/2020 |
Last Updated / Time |
31/10/2020 16:21 PM |
Closing Date / Time |
28/05/2020 17:00 PM |
Description |
|
Republic of the Philippines Department of Environment and Natural Resources FORESTLAND MANAGEMENT PROJECT Province of Iloilo, Region VI BILL OF QUANTITIES Subproject Title/Name Construction of cabatangan Irrigation and Pipeline System Category Sub-Project Number Physical Test Brgy./Mun./Province Ulian Subwatershed, Municipality of Lambunao, Iloilo, Region 6 Total Estimated Subproject Cost (PHP) 36,355,535.31 Project Description: Implementation Mode by contract "Construction of Cabatangan Irrigation and Pipeline System which is in General consist of supply and installation of 27,076.51m of HDPE Pipe SDR17, (broken down into, Source No.1 of 9,751m of 63mm nom. Dia., 7,049m of 50mm nom. Dia., 1,420.68m of 40mm nom. Dia., and 164m of 63.5mm diameter G.I Pipe Schedule 40; Source No.2 of 3,454m of 50mm nom. Dia., 4,616.30m of 40mm nom. Dia., 518.53m of 25mm nom. Dia. HDPE pipe, and 60m of 63.5mm dia. and 40m of 50mm diameter G.I Pipe Schedule 40). All pipe will be burried 0.4m below the ground, except on crossing of deep creeks and live creeks. It also include supply of 20mm dia. HDPE SDR 17 Pipe, 6000m for source No. 1 and 6000m for source No. 2 for used by the Farmers/PO’s in watering the agro forest trees. The system also includes the construction of filtration tanks, reservoirs and pressure brakers. All structure are provided with stubouts for connection to 12.5mm dia. HDPE Pipe. This is located in Ulian subwatershed, municipality of lambunao, Iloilo, Region
" Project Duration 480 CD (w/ 30 unworkable days) Equipment Needed Bar Cutter Cargo Truck, 6 tons, 195 hp Tractor Welding Machine Plate Compactor, Vibratory, 5 hp Concrete Vibrator, 50mm dia., Gas Driven ITEM NO. DESCRIPTION WT. % QUANTITY UNIT UNIT COST TOTAL COST Part I A.1.1 (1) Construction field office for the Engineer, 40 sq.m 1 ls PART II OTHER GENERAL REQUIREMENTS B.4 (8) Permanent Monuments and Markers 1 ea. B.5 Project Billboard / Signboard 2 ea. B.7 Ocupational Safety and Health Program 1 L.S. B.9 Mobilization / Demobilization 1 L.S. PART III IRRIGATION PIPELINE WORKS I. Source 1 A RESERVOIR, FILTRATION, STUBOUT, PRESSURE BREAKER AND VALVE BOX 900 (1) Structural Concrete, 3000 psi, 28 days 184 cu.m. 902 (1) Reinforcing Steel, Grade 40 7,023 kg 903 (1) Forms and Falseworks 795 sq.m 1016 (1) Waterproofing 326 sq.m 1031 (1) Painting, Concrete 462 sq.m 1046 (1) a CHB Walling, 100 mm thk 92 sq.m 1046 (1) b CHB Walling, 150 mm thk 66 sq.m 1046 (1) b Cement Finish 1,078 sq.m 1600 (1) Structure Excavation for Structures 300 cu.m 1601 (1)a Structure Backfill for Structures 107 cu.m SPL 1 a Valve Box Steel cocer 1, 45mm x 85mm 2mm thk 25 pc SPL 1 b Valve Box Steel cocer 2, 45mm x 45mm 2mm thk 12 pc SPL 1 c Stubout Cover, 55mm x 1300mm x 2mm thk 12 pc SPL 2 Stub-Out Piping, G.I Fittings, Valves, Nipple 1 lot SPL 3 Pipes and fittings in the reservoir, Filtration, Presure breaker 1 lot B PIPES 1001 (1) a Supply of 20mm nominal dia HDPE, SDR 17, including fittings, to pipe storage house 6,000 ln.m 1001 (1) b Supply and installation of 40mm nominal dia. HDPE, SDR 17 1,421 ln.m 1001 (1) c Supply and installation of 50mm nominal dia. HDPE, SDR 18 7,049 ln.m 1001 (1) d Supply and installation of 63mm nominal dia. HDPE, SDR 19 9,751 ln.m 1001 (2) a Supply and installation of 63mm dia. G.I Pipe Sched. 40 160 ln.m 1600 (2) Structure Excavation, for pipe 1,471 cu.m 1601 (1) a Structure Backfill, for pipe 1,424 cu.m 1600 (1) b Sand Envelop for HDPE Pipes 400 cu.m C GATE VALVES 1603 (1) b Gate Valves in Main Pipe, 40mm 4 pc 1603 (1) c Gate Valves in Main Pipe, 50mm 16 pc 1603 (1) d Gate Valves in Main Pipe, 63mm 21 pc D PIPE HANGER, (INCLUDING PIPE) SPL4a Pipe hanger, (Including G.I. Pipe, Sch. 40) type A 4 unit SPL4b Pipe hanger, (Including G.I. Pipe, Sch. 40) type B 4 unit SPL4c Pipe hanger, (Including G.I. Pipe, Sch. 40) type C 4 unit E PIPE ALIGNMENT MARKERS, 0.15 X 0.39 SPL5 Pipe Alignment Markers, 0.15 x 0.40 184 pc G INTAKE STRUCTURES 900 (1) Structural Concrete, 3000 psi, 28 days 6 cu.m 1002 (2)b Supply and Installation of 75mm G.I Pipe, Scs 40. including fitting 24 cu.m 1001 (2)a Supply and Installation of 150mm dia PVC Pipe, Series 1000, Perporated 24 ln.m 1040 (1) welded steel Matting, 150 x 150mm x 2mm wire strand 75 sq.m 1600 (1) Structure Excavation 15 cu.m 1603 (3)d 75mm Gate Valves, Including attachment 2 pc 1713 (1) Rubble Masonry 37 cu.m SPL6 Concrete Blocks 12 cu.m H PIPE STORAGE HOUSE 1 unit TOTAL COST SOURCE 1 II SOURCE 2 A RESERVOIR, FILTRATION, STUBOUT, PRESSURE BREAKER AND VALVE BOX 900 (1) Structural Concrete, 3000 psi, 28 days 141 cu.m. 902 (1) Reinforcing Steel, Grade 40 2,007 kg 903 (1) Forms and Falseworks 721 sq.m 1016 (1) Waterproofing 278 sq.m 1031 (1) Painting, Concrete 388 sq.m 1046 (1) a CHB Walling, 100 mm thk 93 sq.m 1046 (1) b CHB Walling, 150 mm thk 54 sq.m 1046 (1) b Cement Finish 884 sq.m 1600 (1) Structure Excavation for Structures 242 cu.m 1601 (1)a Structure Backfill for Structures 98 cu.m SPL 1 a Valve Box Steel cover 1, 45mm x 85mm 2mm thk 25 pc SPL 1 b Valve Box Steel cover 2, 45mm x 45mm 2mm thk 12 pc SPL 1 c Stubout Cover, 55mm x 1300mm x 2mm thk 12 pc SPL 2 Stub-Out Piping, G.I Fittings, Valves, Nipple 12 lot SPL 3 Pipes and fittings in the reservoir, Filtration, Presure breaker 1 lot B PIPES 1001 (1) a Supply of 20mm nominal dia HDPE, SDR 17, including fittings, to pipe storage house 6,000 ln.m 1001 (1) b Supply and installation of 25mm nominal dia. HDPE, SDR 17 519 ln.m 1001 (1) c Supply and installation of 40mm nominal dia. HDPE, SDR 18 4,617 ln.m 1001 (1) d Supply and installation of 50mm nominal dia. HDPE, SDR 19 3,454 ln.m 1001 (2) a Supply and installation of 50mm dia. G.I Pipe Sched. 40 40 ln.m 1001 (2) b Supply and installation of 63mm dia. G.I Pipe Sched. 40 60 ln.m 1600 (2) Structure Excavation, for pipe 685 cu.m 1601 (1) a Structure Backfill, for pipe 672 cu.m 1600 (1) b Sand Envelop for HDPE Pipes 164 cu.m C GATE VALVES 1603 (1) b Gate Valves in Main Pipe, 25mm 15 pc 1603 (1) c Gate Valves in Main Pipe, 40mm 6 pc 1603 (1) d Gate Valves in Main Pipe, 50mm 29 pc D PIPE HANGER, (INCLUDING PIPE) SPL4a Pipe hanger, (Including G.I. Pipe, Sch. 40) type A 5 unit SPL4b Pipe hanger, (Including G.I. Pipe, Sch. 40) type B 4 unit SPL4c Pipe hanger, (Including G.I. Pipe, Sch. 40) type C 2 unit E PIPE ALIGNMENT MARKERS, 0.15 X 0.39 SPL5 Pipe Alignment Markers, 0.15 x 0.40 88 pc G INTAKE STRUCTURES 900 (1) Structural Concrete, 3000 psi, 28 days 4 cu.m 1002 (2)b Supply and Installation of 75mm G.I Pipe, Scs 40. including fitting 24 cu.m 1001 (2)a Supply and Installation of 150mm dia PVC Pipe, Series 1000, Perporated 24 ln.m 1040 (1) welded steel Matting, 150 x 150mm x 2mm wire strand 55 sq.m 1600 (1) Structure Excavation 11 cu.m 1603 (3)d 75mm Gate Valves, Including attachment 2 pc 1713 (1) Rubble Masonry 24 cu.m SPL6 Concrete Blocks 12 cu.m H PIPE STORAGE HOUSE 1 unit TOTAL COST SOURCE 1 TOTAL SUB PROJECT COST LOCAL CONTRACTORS ARE PREFERRED |
|
Line Items |
1 | Construction of Cabatangan IPS | Brgy. Cabatangan, Lambuna Iloilo | 1 | Lot | 36,355,535.31 |
|
Pre-bid Conference |
19/03/2020 |
9:30:00 AM |
DENR, PENRO, ILOILO Old Rotary Park, Brgy. Concepcion, Iloilo City |
|
|
|
|
Remarks |
Submission and Opening of Bids on May 28, 2020@ 9:30AM
|
|
|
Created by |
EVELYN COLUMBRES MALIGAD |
Date Created |
08/03/2020 |
|
|
|
|
|