| Reference Number |
12336039 |
| Procuring Entity |
NUEVA ECIJA UNIVERSITY OF SCIENCE AND TECHNOLOGY |
| Title |
Supply Delivery and Installation of Hybrid Solar for College of Medicine |
| Area of Delivery |
Nueva Ecija |
|
| Solicitation Number: |
08222025001 |
| Trade Agreement: |
Implementing Rules and Regulations |
| Procurement Mode: |
Negotiated Procurement - Small Value Procurement (Sec. 53.9) |
| Classification: |
Goods |
| Category: |
Electrical Systems and Lighting Components |
| Approved Budget for the Contract: |
PHP 600,000.00
|
| Delivery Period: |
60 Day/s |
| Client Agency: |
|
|
| Contact Person: |
Joseph Castillo Cariño BUYER 1 gen.tinio st. cabanatuan city Cabanatuan City Nueva Ecija Philippines 3100 63-955-6756909
jcc.neustproc.unit@gmail.com |
|
Status |
Awarded |
| Associated Components |
2 |
| Bid Supplements |
0 |
| Document Request List |
4 |
| Date Published |
23/08/2025 |
| Last Updated / Time |
14/10/2025 13:04 PM |
| Closing Date / Time |
29/08/2025 16:00 PM |
|
Description |
| |
INVITATION TO SUBMIT PRICE QUOTATION
The Nueva Ecija University of Science and Technology (NEUST) through the Bids and Awards Committee (BAC), hereby invites all interested entities registered with the Philippine Government Electronic Procurement System (PhilGEPS) to bid for the hereunder project, subject to the General Conditions stated herein.
Name of Project: Supply Delivery and Installation of Hybrid Solar for College of Medicine Location: NEUST, Cabanatuan City Approved Budget for the Contract: Php600,000.00 Contract Duration: 60 Calendar Days Source of Fund: Income
PROJECT DESCRIPTION: ONE (1) LOT ITEM NO. QTY UNIT ITEM AND DESCRIPTION 1 1 set 8KW Hybrid Solar w/ 15 KWR Battery (7.5-15hrs) 5 Years’ Service/Unit Warranty 16pcs 620watts or above Solar Panel 8KW Hybrid Inverter Clams and Railing Panel Box, Cables, Conduits, Protective Devices, Grounding and Other Accessories
Including Training for operations and maintenance of the system and User manual
Specification: Solar Panel 600w • Monocrystalline • 3.2mm coated tempered glass • Aluminum alloy frame • 585 watts output 8kw Hybrid Inverter • Max PV input power 12,800w • 2 MPPT 2 strings per MPPT • 220/230v • 50/60Hz • Grid connection L+N+PE • Rated AC input/output 8000w • Max AC input/output apparent power 8800w • Ingress protection IP65 • Intelligent air-cooling • Grid regulation IEC 61727, IEC 62116, CEI 0-21, EN 50549, NRS 097, RD 140, UNE 217002, • OVE-Richtlinie R25, G98,G99, VDE-AR-N 4105 • Safety EMC / Standard IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2 PV Cable • 4mm2 • Conductor: tinned copper, class 5 (flexible) according to BS EN 60228 • Insulation: XLPO (cross linked polyolefin) • Sheath: XLPO (cross linked polyolefin) • Core colors: red or black • Rated voltage: AC 0.6/1.0 kV. DC 1.0/1.8kV • Operating temperature: -40°C to +90°C (conductor max. 120 °C) • Current carrying capacity: 50-55amps (approximate, varies w/ conditions) • Standards: adapted to PV systems, 2Pfg 1169/08.2007 and EN 50618:2015 • UV resistant • Fire resistant Battery 300AH • Nominal voltage 51.2 Vdc • Nominal capacity 300 Ah • Battery energy 15.36kWh • Charge current 150A • Charge power 7680 W • Discharge current 200A • Discharge power m10240 W • Short circuit current 540A • Weight (kg) 117kg • Installation floor stand • Working temperature -20°C-60C • Display SOC status indicator, LED indicator, LCD display • Communication RS232, RS485, CAN Other Accessories • HDPE flexible hose 32mm • PV module railings • L-foot • Mid clamp • End clamp • Splice kit • Metal enclosure • DC breaker • DC SPD • 125A MCCB battery breaker • Battery cable • AC breaker • AC breaker 32A MCB • AC SPD • 63A automatic transfer switch • AC cable A WG8
GENERAL CONDITIONS: Upon submission of duly accomplished and signed Request for Quotation Form (Annex “A”), the following documents shall be attached. Failure to comply/submit with any of the following requirements shall be a basis for disqualification:
1. Requirements shall be attached upon submission of the quotation: • Official Receipt of Payment of Bid Document. • Certified True Copy of DTI Certificate of Business Name Registration / SEC Registration Certificate, and Articles of Incorporation. • Certified True Copy of Mayor's / Business Permit • Certified True Copy of Tax Clearance per Executive Order 398 Series 2005, as finally reviewed and approved by the BIR (for ABC's above Php500,000.00) • Certified True Copy of Latest Annual Income Tax Return with supporting documents: (for ABC's above Php500,000.00) o Filing Reference Number (FRN) and the Tax Return Receipt Confirmation (TRRC) o Official Receipt of Payment • Certified True Copy of Certificate of PHILGEPS Registration / Number (Red or Platinum Membership). • Omnibus Sworn Statement in accordance with Section 25.3 of the revised IRR of RA 9184. • Notarized SPA or Secretary’s Certificate if the Bidder is an Authorized Representative. 2. All quotations/entries must be computerized/handwritten. 3. All quotations shall be considered as fixed prices and not subject to price escalation during contract implementation. 4. Duly signed Price Form or Itemized Price Schedule and List of Goods or Bill of Quantities. 5. Any erasures or overwriting shall be valid only if they are signed or initialed by the Contractor/Supplier or his/her authorized representative.
All quotations shall be considered as fixed prices and not subject to price escalation during contract implementation.
Any erasures or overwriting shall be valid only if they are signed or initialed by the supplier or his/her authorized representative.
The BAC is conducting the Alternative Mode of Procurement (Small Value Procurement) for this Contract in accordance with Republic Act No. 9184, as amended by Republic Act No. 12009, and its Implementing Rules and Regulations (IRR).
The quotation and eligibility documents must be submitted in a sealed envelope on or before August 29, 2025 04:00 PM at the Procurement Office, NEUST, Gen. Tinio St. Campus, Cabanatuan City. Fax or email quotations will not be honored.
Section 39 of RA No. 9184, requires the winning bidder to post a performance security, in such form and amount specified under Section 39 of the 2016 Revised IRR, prior to the signing of the contract as a measure of guarantee for the faithful performance of and compliance with his obligations under the contract prepared in accordance with the Bidding Documents
The NEUST reserves the right to reject any or all Quotations, to waive any minor defects therein, to reject all Quotations at any time prior to contract award, without thereby incurring any liability to the affected Bidder(s), and to accept only the offer that is compliant with the law and requirements of the procuring entity.
The NEUST assumes no responsibility whatsoever to compensate or indemnify Bidders for any expenses incurred in the preparation of their Quotation.
For more information concerning this bidding, please contact:
ENGR. JOEL G. DE MESA Head, BAC Secretariat for Goods and Services NEUST Gen. Tinio St., Cabanatuan City Email Address: neustproc.unit@gmail.com
Approved by:
(SGD.) ATTY. BEMBOL DL. CASTILLO BAC Chairperson |
|
|
Line Items |
| 1 | Supply Delivery and Installation of Hybrid Solar f | Electrical Systems and Lighting Components | 1 | Lot | 600,000.00 |
|
|
|
|
|
| Created by |
Joseph Castillo Cariño |
| Date Created |
22/08/2025 |
| |
|
|
|
|