Help
printableBidNoticeAbstract
Bid Notice Abstract
Request for Quotation (RFQ)
Reference Number 10671353
Procuring Entity BUREAU OF FISHERIES AND AQUATIC RESOURCES - RV
Title Supply and Delivery of IT Equipment
Area of Delivery Camarines Sur

Solicitation Number: BFAR5BAC-2024-101
Trade Agreement: Implementing Rules and Regulations
Procurement Mode: Shopping - Ordinary/Regular Office Supplies & Equipment (Sec. 52.1.b)
Classification: Goods
Category: Information Technology Parts & Accessories & Perip
Approved Budget for the Contract: PHP 88,812.00 
Delivery Period: 30 Day/s
Client Agency:

Contact Person: Aries C. Tang
BAC Secretariat
Fabrica
Bula
Camarines Sur
Philippines 4430
63-54-2280498

bfar5_bac@yahoo.com
Status Awarded
Associated Components 1
Bid Supplements 3
Document Request List 2
Date Published 20/03/2024
Last Updated / Time 16/05/2024 10:32 AM
Closing Date / Time 13/05/2024 13:00 PM

Description
 
Request for Quotation

The Bureau of Fisheries and Aquatic Resources, Regional Office No. 5, Fabrica, Bula, Camarines Sur is requesting from prospective suppliers to submit quotation for the Supply and Delivery of IT Equipment.

Quantity Unit Item Description Unit Cost Total Cost
2 Set Processor 39,600.00 79,200.00
Ryzen 5 5600X Socket AM4 3.7GHz with Wraith Stealth Cooler VR Ready Premium Desktop Processor
Motherboard
B550M Mortar Max Wi-Fi Micro-ATX MAG Series Socket Am4 DDR4 Gaming Motherboard
Memory
Elite 16GB 2x8 3200mhz DDR4 Gaming Memory
Heat Spreader: Aluminum heat spreader
Solid State Drive
NV1 PCIe M.2 3.0 NVME 1TB
Solid State Drive SATA
Capacity: 1TB
Interface: SATA II 6Gb/s
NAND Flash: 3D TLC
Sequential Read Performance: 1TB: Up to 560MB/s
Sequential Write Performance: 1TB: Up to 540MB/s
Power Supply
AK600W 600W 80+ RGB Power Supply Bronze
AC Input: 100V-240VAC, 10A-5A, 50-60Hz
DC Output: +3.3V, +5V, +12V, +12V, +12V, 5Vtb
10A, 12A, 21A, 20A, 0.A, 2.5A
Rated Power: 93W. 492W. 16.1W= 600W
Case
Mid Tower Black and White Tempered Glass Case
Side Panel: Tempered Glass
Metal Thickness: 0.5mm
Keyboard
Number of Key: 104 keys, Switch Type: Membrane
Anti-Ghosting: 6 Keys, Connection: Wired
Size: 440 x 130 x 30mm, Weight: 429.3g
Mouse
Mouse Glaiders
Braided Fiber Cable
On the fly sensitivity adjustment
6D Buttons
Omron switch rated for 20 Million clicks
1 Unit HD27G 27” 180HZ FHD Curved Monitor 9,612.00 9,612.00
PANEL TYPE FAST VA
CURVED RATE R1500 Curved Screen Display
SIZE 27 Inches Wide
VIEWING ANGLE 178 H, 178 V
REFRESH RATE UP TO180HZ
VIDEO PORT HDMI, DP
AUDIO PORT AUDIO OUT
POWER INPUT DC 12V 3A
VESA MOUNT 100x100MM

Together with the quotation, the participating prospective suppliers shall also submit the following requirements:

1. Mayor’s/Business Permit
2. PhilGEPS Registration No.

The Approved Budget for the Contract (ABC) is Eighty Eight Thousand Eight Hundred Twelve Pesos (PhP88,812.00) only.

Subject items must be completely delivered within thirty (30) calendar days upon receipt of the Purchase Order by the supplier at BFAR RO5, Fabrica, Bula, Camarines Sur.

All quotations shall be submitted to the Office of the BAC Secretariat, BFAR 5, Fabrica, Bula, Camarines Sur before 1:00 o’clock in the afternoon of March 25, 2024, which shall be opened and evaluated by the BAC thereafter at the Office of the BAC Secretariat at the same address.

This requisition is made thru Alternative Mode of Procurement under Rule XVI of the 2016 Revised IRR of RA 9184, specifically thru Shopping under Section 52.1b and 52.2, as per prior recommendation of the Bids and Awards Committee.

For inquiries, you may contact Ms. Aries C. Tang @ 09161135185 or you may visit the Office of the BAC Secretariat at the BFAR 5, Fabrica, Bula, Camarines Sur.

BFAR RO 5 reserves the right to reject any bid, to waive any part thereof, waive any defect contained therein and accept the offer most advantageous to the interest of the government.



MELCHOR B. DERAMAS
BAC Chairman

Line Items
Item No.Product/Service NameDescriptionQuantityUOMBudget (PHP)
1Supply and DeliveryIT Equipment1Lot88,812.00

Remarks
Opening extended to generate additional quotation.

Created by Aries C. Tang
Date Created 18/03/2024
   

The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party.

  © 2004-2024  DBM Procurement Service. All rights reserved.  
Help |
Contact Us | Sitemap